The latest call
FetchingAIB Data Centers Inc. reported on November 17, 2026. We are fetching the call transcript; its summary follows once the transcript is in.
$0.50-5.1%Nov 27 close
Reported results on November 17, 2026; they are not in these figures yet.
Figures through September 30, 2026, from the 10-Q filed November 16, 2026
Just reported
From AIB Data Centers Inc.'s results release of November 17, 2026; its quarterly report has since been filed.
Actual
$813.2K
-81% y/y
-72% q/q
Guided
—
No guide given
Actual
-$0.06
Guided
—
No guide given
Actual
-$5.2M
| Measure | 3 months toSep 30, 2026 | 3 months toJun 30, 2025 | Change |
|---|---|---|---|
| Total Revenue | $813.2K | $4.7M | -82.86% |
| Profit | -$4.8M | -$541.8K | -787.44% |
| Profit per share | -$0.06 | -$0.01 | -500.00% |
These are single quarters, not a trailing year — the figures elsewhere on this site cover twelve months and will be much larger. A seasonal business swings a long way between the two: ServiceNow earns $2.0B of free cash flow in its December quarter and $0.5B in its June one.
Compared against the same quarter a year earlier, not against an analyst forecast. A “beat” or “miss” needs a consensus estimate, which is licensed data we do not carry — and getting it wrong is worse than leaving it out.
AIB Data Centers Inc. reported on November 17, 2026. We are fetching the call transcript; its summary follows once the transcript is in.
“The third quarter was a turning point for AIB. We signed our first long-term AI customer and nearly doubled our contracted power. This validates our strategy of securing power with a community-first approach and converting it into long-term contracted revenue,”
Quoted verbatim from the release, and shown only when the filing attributes it to a named person.
Releases land before the open or after the close, so the window runs from the close before the report day to the close of the session after it — the reaction is inside it either way.
Data Centers AIB, the right-sized data center development platform, develops 40–90 MW facilities for AI and high-performance computing customers. The Company combines access to reliable power with standardized design and development to improve delivery speed and certainty.
The company’s own description, as it appears at the foot of the release.
The quote and the company description come from AIB Data Centers Inc.’s Item 2.02 8-K filed November 17, 2026; the table is built from its quarterly reports. Read the release on EDGAR Share prices are split- and dividend-adjusted.
Guided
—
No guide given
Set against the company's own guidance and the same quarter a year earlier, not analysts' estimates, which we do not hold. Adjusted figures are the company's own non-GAAP measures, as stated in the release.